steel prop
Submit to get quote!

Steel Prop

Material: Carbon Steel Q235 
Standrad: BS Standard
Packaging: Tito, Stretch Film, Straps
Transportation: By Sea, By Land, By Air
Order Quantity: 1 Tray (100 Pieces)

Steel Prop Advantage

Factory direct sale
Experience: 12 years
Material: stable material supplier
Process: welder + welding robot
Location: port, airport
Customized as required

Name Finish Size(mm) Weight(kg) Price
PSH1 Hot Dip Galvanized 1450-2500 17.51 $24.5
PSH2 Hot Dip Galvanized 1710-3000 19.34 $26.4
PSH3 Hot Dip Galvanized 1965-3500 21.17 $28.35
PSH4 Hot Dip Galvanized 2250-4000 23.82 $31.78
PSH5 Hot Dip Galvanized 2720-5000 28.67 $37.78

Steel Prop Process

Steel Prop Details

NANJING EK METALWORK CO., LTD Was Established In 2011 In Nanjing. All Parts Of EK Scaffolding Props Are Produced By Ourselves, Which Can Guarantee The Delivery Time And Quality Of Each Order Of Customers.
The Factory Produces Independently, Has Two Welding Robots, Which Can Realize Automatic Welding, And Guarantee The Delivery Time While Increasing Production Capacity.
Customers Can Monitor Product Production In Real Time To Ensure Product Quality.
Special Models Can Be Customized.

scaffolding steel prop
scaffolding steel prop
scaffolding steel prop
scaffolding steel prop

Production Process of Steel Prop

The production process of the steel prop is divided into 10 steps. 
Material → Inner Tube → Outer Tube → hot dip galvanized → G Pin → Nut → Assemble → Finished Process → Package → Transport
First, the raw materials are purchased. After the raw materials enter the factory, the steel pipes are cut into inner and outer pipes by laser cutting machines and other equipment according to customer needs, Weld the base of the inner and outer tubes by means of welding robots and manual welding.

steel prop material
steel prop outer tube cutting
steel prop inner tube cutting
Steel Prop inner tube welding
steel prop inner tube cutting
steel prop inner tube welding
steel prop inner tube
steel prop outer tube

Next, the inner and outer pipes need to be treated, the common ones are hot-dip galvanizing and painting.

steel prop
steel prop surface treatment
steel prop surface treatment
steel prop surface treatment

In addition, you need to prepare steel prop accessories, such as G Pin and Nut.The installation step can be carried out after the galvanizing is completed.

steel prop G pin
steel prop nut
steel prop nut

After the installation and commissioning of the steel prop is completed, workers will carry out surface treatment, and then pack it into pallets.

Steel Prop
Steel Prop
steel prop finish process
steel prop

EK professional QC merchandiser will check and take inventory of the steel prop after packing, and send photos to customers to inform them of packing time and other information.

scaffolding steel prop
scaffolding steel prop
scaffolding steel prop
scaffolding steel prop
scaffolding steel prop
scaffolding steel prop
scaffolding steel prop
scaffolding steel prop

Relate products

Base Jack
Base Jack
scaffolding gate
scaffolding gate
cuplock-scaffolding
cuplock-scaffolding
ringlock-scaffolding
Scroll to Top

Send us inquiry now